检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:梁志坚[1]
机构地区:[1]广西水利电力勘测设计研究院,广西南宁530023
出 处:《广西水利水电》2009年第3期23-25,29,共4页Guangxi Water Resources & Hydropower Engineering
摘 要:合面狮水库大坝由于原灌浆帷幕已基本失效,混凝土与基岩接触部位透水率较大且局部较严重。通过对大坝断面形状和结构情况的详细研究,运用三维设计手段精确确定钻孔位置与矢量参数(包括水平转角、竖直转角与长度),保证在一定基岩透水率情况下形成的三维错孔帷幕具有三维的连续性。Hemianshi reservoir has been designed with a slotted concrete gravity dam. Because the original curtain grouting generally cease to be effective, the permeability rate is relatively high and even serious locally at the positions of concrete in contact with base rock, rendering a significant hidden danger. Based on a detailed study of the profiles and structures of the main dam, the boring locations and vector data including horizontal angles, vertical angles and length etc. were determined accurately by 3D design method, so as to ensure the continuity of 3-dimensional staggered hole curtain under fixed base rock permeability rate.
分 类 号:TV543[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222