积石峡水电站中孔泄洪洞平板工作闸门槽空化特性研究  被引量:1

Study on cavitation characteristic of working gate slots in middle spillway tunnel of Jishixia hydropower station

在线阅读下载全文

作  者:薛阳[1] 刘韩生[1] 安梦雄[1] 

机构地区:[1]西北农林科技大学,陕西杨凌712100

出  处:《水力发电学报》2009年第3期152-156,共5页Journal of Hydroelectric Engineering

摘  要:一般情况,工作闸门采用弧门,无门槽空化问题,但有的工程由于其它条件限制,而采用平板工作闸门,其门槽空化特性需要深入研究。本文结合积石峡水电站中孔泄洪洞,通过减压模型试验对平板工作闸门槽的空化特性进行了研究。利用空化噪声测量,分析了不同运行水位和不同闸门开度时,门槽体型的空化特性。试验结果表明,该工作闸门槽体型的空化特性良好,可以满足工程运行的需要。Generally, there is without problem of gate slots cavitation when arch gate is used as the working gate, however, urder some restrictive conditions, the flat gate is used as the working gate in middle outlet in Jishixia hydropower station. The cavitation characteristic of working gate slot is studied by the decompression model test. By means of acoustics method, the flat working gate slots cavitation characteristic is studied at different water level with different gate opening. The test results indicate that the working gate slot hasn't cavitation and it can be put into operation.

关 键 词:水力学 平板工作闸门槽 减压模型试验 空化噪声 中孔泄洪洞 

分 类 号:TV131.32[水利工程—水力学及河流动力学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象