黄河沙坡头水库泥沙冲淤分析  被引量:1

Analysis of reservoir sediment souring and silting for the Shapotou Water Control Project on the Yellow River

在线阅读下载全文

作  者:郑贺新[1] 

机构地区:[1]水利部天津水利水电勘测设计研究院

出  处:《水利水电工程设计》1998年第2期28-29,34,共3页Design of Water Resources & Hydroelectric Engineering

摘  要:为解决黄河沙坡头水利枢纽泥沙问题,利用一维全沙数学模型,对有无大柳树水库条件下的沙波头水库不同运用方式进行分析计算,认为正常蓄水位1240.5m、汛期7~9月1238m运用方式能有效保持水库的兴利调节库容,且对上游的大柳树水库不造成影响。In order to solve sediment problem of the Shapotou Water Control Project on the Yellow River,analysis and calculation for various operation modes were carried out with onedimension mathematics model and the result is that the operation mode with 1 2405 m of normal highwater level and 1 238 m of water level during July to September not only can keep regulating storage effectively but also there is no effect to the Daliushu Reservoir on the upstream

关 键 词:泥沙 冲淤 调节库容 水库泥沙 

分 类 号:TV145.1[水利工程—水力学及河流动力学] TV697.31

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象