龙口水利枢纽重力坝深层抗滑稳定设计  被引量:1

Design for stability against deep sliding of gravity dam of the Longkou Water Control Project on the Yellow River

在线阅读下载全文

作  者:张喜华[1] 

机构地区:[1]水利部天津水利水电勘测设计研究院

出  处:《水利水电工程设计》1998年第2期14-16,共3页Design of Water Resources & Hydroelectric Engineering

摘  要:黄河龙口水利枢纽坝基持力层存在多条平缓泥化夹层及糜棱岩状夹层,对坝基的深层抗滑稳定极为不利,必须采取工程措施对泥化夹层及摩棱岩进行处理,以满足深层抗滑稳定要求,本文分析比较了多种工程措施,推荐采用坝踵深齿槽方案加固坝基。There are several gently clay seams and mylonitic interlayers in holding strata to seriously adverse to stability of deep sliding of damfoundationThe engineering measures for clay seams and mylonitic interlays must be taken in order to meet with the requirement of stability of deep slidingThis article compares several engineering measures,and recommends use of deep cutoff trench at dam heel to consolidate dam foundation

关 键 词:深层抗滑 泥化夹层 齿槽 重力坝 磨棱岩 加固 

分 类 号:TV642.3[水利工程—水利水电工程] TV223.31

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象