检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]石家庄铁道学院土木工程分院,河北石家庄050043
出 处:《石家庄铁道学院学报(自然科学版)》2009年第2期15-19,共5页Journal of Shijiazhuang Railway Institute
摘 要:介绍了跨陇海铁路郑州-西安段黄龙村大跨连续梁桥以及跨京珠高速公路武汉-广州段三王石大跨连续梁桥的施工监控思路、方法和执行过程,通过分析影响监控结果的影响因素,制定了合理的施工监控方案。并通过对这两座相同桥梁的监控实践提出了一种有效的应力控制理论,即"界限控制法"和"增量控制法"。详细介绍了监控过程中需要注意的问题和监测常用设备,这为以后大跨预应力混凝土连续梁桥的施工提供了有益的借鉴。The strategy, method and process of construction monitoring for Huanglongcun large span continuous beam bridge which flies over Long-Hal Railway and Sanwangshi large span continuous beam bridge which flies over Jing-Zhu Highway are introduced in this paper. By analyzing the factors which may influence the monitoring result, the reasonable monitoring scheme is made. Through these two bridges' practice on construction monitoring, an effectual theory about stress monitoring is proposed, i. e. , "boundary control method" and "increment control method". Also introduced in this paper are some problems that should be considered in monitoring process and monitoring conventional equipment, which may be of reference value for the construction of large span prestressed concrete continuous beam.
分 类 号:U446.2[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.157