检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华北电力大学电气与电子工程学院,北京102206
出 处:《现代电力》2009年第4期1-3,共3页Modern Electric Power
基 金:国家自然科学基金(50707009);国家自然科学基金重大项目(50595410);国家重点基础研究专项计划(973计划)资助项目(2004CB217901)
摘 要:针对电力系统动态仿真中某些模型和参数不准确问题,提出用移相变压器模型注入实测数据来等效某部分电网,即将实测与仿真结合起来,以大型仿真软件PSS/E自带的IPLAN为二次开发平台,进行电力系统混合仿真。以6机23节点系统为算例,首先对全网动态仿真以获取实测数据,然后实施混合仿真,结果表明该方法正确可行。According to the inaccuracy problem of models and parameters in the dynamic simulation to injecting measured data, a method is proposed by using the phase-shifting transformer model to replace some part of the power grid. Based on the secondary development language IPLAN provided by simulation software PSS/E, the hybrid simulation of power system is made by combining the measurment with simulation. Taking the 6 - machine 23 - bus system for example, the measured data are obtained through dynamic simulation of the whole network. The hybrid simulation result shows that the method is feasible.
分 类 号:TM743[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.12.149.233