检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]安徽建筑工业学院,安徽230022 [2]上海第二工业大学,上海200041
出 处:《运筹学学报》1998年第1期71-78,共8页Operations Research Transactions
基 金:国家自然科学基金;安徽省教委科研基金
摘 要:1992年M.Dror提出工件的加工时间依赖于机器的排序问题(schedulingwithmachinedependentprocessingtimes),并研究以最大完工时间(makespan)和以总的完工时间为优化目标的两种这类排序问题.然而,M.Dror对以总的完工时间为优化目标提出的“最优算法”是错误的.本文用算例表明他提出的算法不是最优的,并在机器连续加工的条件下,把这个排序问题转化成指派问题(assignmentproblem),从而可以用匈牙利算法得到最优解.最后,我们提出几个尚未解决的问题,以期引起国内外同行进一步研究.M.Dror examined the open-shop scheduling problem with machine dependent processing times in 1992. Two criteria were considered: minimizing the maximum completion time (makespan), and minimizing the total completion time. In this paper we show that the 'algorithm' for the second criterion proposed by him is wrong. Then, we formulate the problem to minimize the total completion time as an asslgnoment model when machines are continuously available and are never kept idle while work is walting, and apply the Hungarian method to solve it. Several questions are still unanswered.We describe tree open problems for further research at last.
分 类 号:O223[理学—运筹学与控制论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28