污水处理厂土建阶段施工要点及质量控制分析  被引量:2

Analysis of construction points and quality control in the phase of civit construction for municipal wastewater treatment plant

在线阅读下载全文

作  者:常心毅[1] 刘海英[1] 

机构地区:[1]中铁十八局集团有限公司第三工程有限公司

出  处:《山西建筑》2009年第22期150-151,共2页Shanxi Architecture

摘  要:通过总结多年施工经验和教训,针对污水处理厂土建阶段施工重点和难点,分析了混凝土构筑物防渗漏、预应力混凝土水池、沉井、异形混凝土构筑物等施工要点和施工过程中的质量控制关键点,提出了相应的管理措施。In this study, we summarize the construction experience and lessons of many years, and briefly review previous construction points including seepage and leakproof of concrete structure, prestressed concrete pool, open caisson, heterotypic concrete structure, etc. in view of the emphasis and difficulty in the phase of civil construction for municipal wastewater treatment plant. At the same time we further analyze the quality control pivotal points in the construction phase and provide the corresponding management measurement.

关 键 词:城市污水处理厂 施工要点 质量控制 土建阶段 

分 类 号:TU745[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象