包头壕赖沟铁矿开采沉陷规律预测  

Forecast of mining subsidence regular at the Haolaigou iron ore mine in Baotou

在线阅读下载全文

作  者:武雄[1] 徐能雄[1] 田红[1] 于沭[1] 岳茂华 杨锦华[3] 房利民 

机构地区:[1]中国地质大学(北京)水资源与环境工程北京市重点实验室,北京100083 [2]内蒙古自治区地质环境监测院包头分院,内蒙古包头014010 [3]包头市国土资源局,内蒙古包头014010

出  处:《煤炭学报》2009年第7期887-891,共5页Journal of China Coal Society

基  金:国家自然科学基金资助项目(40602036);水利部科技创新项目(Scxc2005-11)

摘  要:采用自行开发的ROCK MODEL程序建立了研究区三维地质模型,然后根据现场实际情况进行反演分析,确定矿体开采范围和岩土体物理力学参数;其次对塌陷坑现状进行流变分析;最后对二次塌陷进行弹塑性和流变计算,预测塌陷坑最终的发育范围,并提出相应防治措施.研究结果表明,塌陷坑在考虑流变情况下不会对外围公路产生影响,在二次塌陷情况下,会影响外围公路的安全运行,建议尽快进行处理.A 3D geological model in the study area with the ROCK MODEL software was developed. Then according to in-situ conditions, the range of orebody mining and the physical and mechanical parameters of rock and soil mass were confirmed by inversion analysis. The creep analysis of the pit actuality was done. The elas-plasticity and creep of the second collapse were computed, and the final range of the pit was forecasted. Also, corres-ponding control measures were advanced. The results demonstrate that the collapse pit will not affect the road even though considering creep, but it will affect the road safety on the condition of second collapse. So the collapse pit should be deal with as soon as possible.

关 键 词:开采沉陷 弹塑性分析 流变分析 二次塌陷 

分 类 号:TD325.4[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象