检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]大唐韩城发电厂,陕西韩城715400 [2]陕西电力科学研究院,陕西西安710054
出 处:《青海电力》2009年第2期37-39,共3页Qinghai Electric Power
摘 要:通过对大唐韩城发电厂Ⅱ期2台125 MW机组胶球系统历史、现状运行情况进行分析,得出该机组胶球回收率低的主要原因是收球网条栅孔通流面积不足、运行中条栅孔堵塞结垢无法清扫、下部锥角偏大,并通过在原有收球网结构基础上进行改造增大通流面积、减小下部锥角,实现运行中自清洗功能,取得较好效果。The paper analyses history and present situation of two 125MW units rubber - ball system in secondary phase of Datang Hancheng power plant, the main reason of low recovery rate for rubber - ball is deficiency of the flow area of hall recovery net gate hole, gate hole with clogging and scaling cannot clean in operation, the low parts taper angle slightly large. Through increasing flow area and reducing lower parts taper angle on the basis of old hall recovery net structure, it realizes self- cleaning in operation, and obtains favourable effect.
分 类 号:TK364.1[动力工程及工程热物理—热能工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28