检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘平元[1] 陈朝松[1] 张妮乐[1] 刘进[1]
机构地区:[1]上海发电设备成套设计研究院,上海200240
出 处:《动力工程》2009年第7期618-621,共4页Power Engineering
摘 要:国华三河电厂1号、2号锅炉自投运以来,再热器整体和局部超温严重,影响机组的安全经济运行.通过实施基于受控涡量燃烧模式的辅助风(AA)反切改造方案和受热面改造,再热器减温水量大幅减少,同时末级再热器局部超温问题得到有效解决,大大提高了锅炉机组运行的安全性和经济性,获得了良好的经济效益和社会效益.Since the commission of No. 1, No. 2 boiler in Guohua Sanhe power plant, integral and local overheating of reheater have been very serious, which influences the safe and economic operation of the unit. Through the application of counter-tangential auxiliary air based on Controlled Vortex Flux Firing Mode and retrofit of heating surface, the amount of desuperheating water for reheater is decreased greatly. At the same time, the problem of local overheating of final-stage reheater is effectively solved. The safety and economy of the boiler unit are increased greatly and large social and economical benefits are gained.
分 类 号:TK223.3[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15