检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国建筑科学研究院地基基础研究所 [2]安阳钢铁公司
出 处:《建筑科学》1998年第4期19-24,共6页Building Science
摘 要:对于较深的基坑支护,当采用排桩作支护主体时,根据所开挖基坑平面形状与周围环境,设置一道环梁,通过撑、锚将桩顶冠梁与环梁联接,构成环梁撑锚系统。该系统构思新颖,具有工艺简单,安全可靠,土方开挖方便,基坑周围表面无沉陷,节省造价等特点。本文介绍了应用该系统的两个工程实例,并提出了环梁近似计算方法。When the concrete pile walls are adopted for deep excavation,according as the plane shape of pit and surroundings around excavation,a ring beam in combination with beams at the top of piles,tie rods and compression bars can make up a support system at the top of pile walls This system is of novel conception,and has advantages of simple construction,safety,convenient excavation of earth,no surface subsidence around excavation and economization of cost In the paper its use in two engineering examples is introduced and the approximate calculation method for the ring beam is given
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229