检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京市第五住宅建筑工程公司,北京100026
出 处:《建筑技术》1998年第4期246-247,共2页Architecture Technology
摘 要:北京新亚综合楼施工中,由于工期短、场地狭小,采用了土钉支护方案。并在防水施工中,合理地选用防水卷材,科学施工。经济分析表明,该方案可减少土方挖填,少占施工用地,节省支模用工,提前工期60d,经济效益显著。During construction of the Beijing Xinya Comprehensive Building project, there were difficulties such as short of construction period and narrow of construction site.It was therefore, the soil anchor bracing method adopted for the project.During waterproof construction, there were numerous effective measures ap-plied,namely: 1,rational selection of waterproof material and 2,scientific management of construction.As a result, its economic analysis has indicated the following ad-vantages such as: reduction of earthwork, less occupation of construction site, saving of formwork and shortening of construction time for 60.d Finally, it had gained an outstanding economic efficiency.
分 类 号:TU942[建筑科学—建筑技术科学] TU943.1
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222