检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华北水利水电学院土木与交通学院,郑州450011 [2]河南省农业科学院,郑州450002
出 处:《长江科学院院报》2009年第8期73-75,共3页Journal of Changjiang River Scientific Research Institute
基 金:华北水利水电学院青年科研基金(HSQJ2008003)
摘 要:由于蒲石河抽水蓄能电站闸前水位较高,水推力大,传统的钢筋混凝土结构不能满足强度和刚度方面的要求。针对这个特点,建立预应力空腔式锚块闸墩模型来模拟闸墩在几种工况下的应力,并对结果进行了详细分析。结果显示计算模型可以真实地反映物理模型的应力应变状态。计算结果为蒲石河抽水蓄能电站预应力闸墩设计及施工提供了重要的依据。Because of the high water level and the big water pressure of the Pushi River Pumped Storage Power Station, traditional ferroconcrete structure couldn' t statisfy the need of intensity and rigidity. The article establishes a prestressed hollow anchor block pier model simulating the stress of the pier with several working conditions and analyses the result in detail; the calculating model really reflects the state of stress and strain about physical model, so the computed result can provide important basis of the design and construction of prestressed pier of the Pushi River Pumped Storage Power Station.
分 类 号:TV662.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.188