检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]新疆克孜尔水库管理局,新疆拜城842313 [2]南京水利科学研究院,江苏南京210029
出 处:《大坝与安全》2009年第2期22-26,共5页Dam & Safety
摘 要:克孜尔水库由于初步设计中实测洪水资料系列较短,资料代表性不足,本次设计洪水复核在1984年补充初步设计的基础上,增加了1983~2006年的连续洪水系列。经复核,水库现状防洪能力达不到1000年一遇设计洪水标准,应采取工程措施使水库防洪能力达到设计要求。Because of the lack of measured floods data series in preliminary design in 1984, analysis on flood control capacity of Kezier reservoir this time added the series of consecutive floods from 1983-2006. After review, it was found that the status of flood control capacity of the reservoir was less than the design flood standard (1/1000). Engineering measures should be taken to im- prove flood control capacity. At the same time, the reservoir was located on sediment-laden river that its siltation was serious. With longer running time, flood control capacity of reservoir would be reduced. It was recommended that further study of reservoir siltation reduction measures should be carried out.
分 类 号:TV697.13[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49