检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:沈启亮[1]
机构地区:[1]中交第四航务工程勘察设计院有限公司,广东广州510230
出 处:《港工技术》2009年第B07期67-69,共3页Port Engineering Technology
摘 要:大亚湾某工程为30万t级外海高桩墩台原油码头,水上共18个墩台,其中16个墩台采用钢管桩基础。该地区常年潮差较大,波高浪急,台风频袭。结合该工程,介绍GPS-RTK打桩定位系统在沉桩施工的应用和沉桩工作流程,详细推导出船固坐标与施工坐标的转换关系。There are 18 dolphens in total for a piled crude oil jetty for 300 000 DWT tankers in Dayaowan Gulf, out of which 16 dolphens are built on steel tubular piles. In this region, the perennial tidal range is great with high waves and rapid swells as well as frequent typhoons. The application of the GPS-RTK Pile Positioning System for piling for the project and the pile driving procedures are described and the conversion of the ship fixation coordinates to the construction coordinates is also derived.
分 类 号:P228.4[天文地球—大地测量学与测量工程] U655.552[天文地球—测绘科学与技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145