多因素影响下的工期索赔计算原则研究  被引量:2

Study on the Principle of Calculation of Delay Claims for Project under Multi-Factor Affection

在线阅读下载全文

作  者:朱建国[1] 沈杰[1] 

机构地区:[1]东南大学土木工程学院,江苏南京210096

出  处:《建筑经济》2009年第8期90-92,共3页Construction Economy

摘  要:多因素影响下的工期索赔计算牵涉到三个重要问题:共同延误的索赔处理原则、网络计算的叠加和发散效应和时差的所有权。从共同延误的索赔处理原则入手,深入分析了网络计算叠加和发散效应产生的根本原因,探讨了时差所有权的归属问题。基于公平、简便和可操作性的考虑,提出了多因素影响下工期索赔计算的三个基本原则。Calculation of delay claims for project under muhifactor affection concerns about three important problems: principle of concurrent delay claims, piling up and effect-weakening of network calculation, ownership of float times. Starting from principle of concurrent delay claims, this paper analyzes the basic reason for piling up and effect-weakening of network calculation, and discusses about who owns float times. Concerning about justice, convenience, and practicality, this paper brings about three main principles of delay claims for project under multi-factor affection.

关 键 词:多因素 工期索赔 时差 叠加效应 发散效应 

分 类 号:F407.9[经济管理—产业经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象