改建工程中的路面过渡段处理设计  被引量:1

Treatment Design for the Transitional Section during Highway Transformation Work

在线阅读下载全文

作  者:高福华[1] 

机构地区:[1]安徽省交通规划设计研究院,安徽合肥230031

出  处:《安徽建筑》2009年第4期72-73,共2页Anhui Architecture

摘  要:高(河埠)界(子墩)高速公路改建工程全长110km,桥梁及支线上跨结构物较多。如果均加铺18cm,会导致桥梁静载增加过多、上跨桥净高不足等问题。文章针对起终点、净高不足的上跨桥及部分桥梁前后段采取10cm厚沥青混凝土面层过渡段进行特殊处理设计,以减少对原水泥面板的开挖量。The transformation work of Highway Gaohebeng-Jiezidun covers a total length of 110km with pretty many bridges along the road and overpass structures at the secondary line. If the mad is generally repaved by 18cm, it will bring forth the problems such as too much dead load on the bridge and insufficient clear height between road and overpass. The article proposes the special treatment design of 10cm thick asphalt concrete at the transitional section to solve the problems above mentioned.

关 键 词:改建工程 过渡路面 静载 沥青混凝土 

分 类 号:U418.8[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象