检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]浙江工商大学环境工程系,浙江杭州310012
出 处:《水资源保护》2009年第4期70-72,81,共4页Water Resources Protection
摘 要:分析SBR系统处理城市污水的主要工艺参数及其对脱氮效果的影响。试验了多种运行控制方式,结果表明:①运行周期6 h,SBR即可较好地完成污水有机物氧化和同时脱氮;将闲置阶段设置在进水和曝气两阶段之间,可大幅度提高TN的去除率。②闲置时间会影响脱氮效果,最佳闲置时间为30 min;增加污泥负荷,可提高TN的去除率,但会降低NH3-N的硝化效果。The main process parameters and their effects on biological nitrogen removal in an Sequencing Batch Reactor (SBR) system treating municipal sewage were studied. Various operating modes were tested and the following conclusions could be drawn: (1) When the operation period was six hours, nitrogen removal and organic oxidation could be accomplished readily, and the removal rate of TN increased greatly when the idling process was set between inttuent and aeration. (2) The idling time impacted the nitrogen removal, and the best idling time was 30 minutes. As the sludge load increased, the nitrification of NH4^+ -N decreased and the removal rate of TN increased.
分 类 号:X703[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.227