检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄建柳[1]
机构地区:[1]中铁第四勘察设计院集团有限公司,武汉430063
出 处:《铁道建筑技术》2009年第8期124-127,共4页Railway Construction Technology
摘 要:在对铁路罐车及洗罐类型的初步介绍后,按检修洗罐工艺流程的需要,以3台位洗罐站工程作为实例对风、汽、水、电等的消耗量进行了分析计算,对总平面布置及洗罐棚设计提出了具体的设计原则和思路,对洗罐站的设计具有一定的指导意义。Based on a brief preview of rail tankers and washing tank styles, this paper systematically analyses the scale of railway washing tank station and the consumption of wind, steam, water, electric power etc. , according to the needs of maintenance and washing tank process. Furthermore, with the needs of production and office facilities, 3-position railway washing tank station is taken to introduce the general layout and washing tank shed layout. This paper has a guiding significance for the design of washing tank station.
分 类 号:TU248.1[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.166