检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]清华大学水沙科学与水利水电工程国家重点实验室,北京100084
出 处:《水力发电学报》2009年第4期81-85,101,共6页Journal of Hydroelectric Engineering
摘 要:本文对水布垭面板坝实测沉降进行整理分析,大坝变形监测仪器工作正常,坝体实测沉降分布规律合理,最大沉降为已填筑坝高的1%,推算填筑堆石体垂直压缩模量达100MPa,坝体填筑质量良好。本文考虑土石料变形的影响因素及材料流变特性,应用统计回归方法建立耦合的指数型坝体沉降统计预报模型,与实测数据拟合很好,预测大坝竣工5年后的沉降略有增加。The settlement data measured in situ of the Shuibuya concrete faced rock-fill dam are analyzed,and a coupled prediction model of exponential statistic settlement is proposed.The monitoring instruments of this dam work in good order,and the measured settlement contours show reasonable trends.The maximum settlement is about 1% of the height of constructed rock-fill dam,and the average of the computed vertical compression modulus is above 100MPa,which indicates a satisfactory compaction quality.The proposed prediction model takes into consideration the influencing factors such as gravity weight,water pressure and rheological properties of rock-fill materials.The predicted maximum settlement of the rock-fill dam will be about 2.46m in 5 years after the dam completion.
关 键 词:水工结构 沉降分析 统计回归 土石坝 水布垭面板坝
分 类 号:TV31[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117