检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华北水利水电学院,郑州450011
出 处:《水力发电学报》2009年第4期92-96,共5页Journal of Hydroelectric Engineering
摘 要:本文详细描述某抽水蓄能电站泄洪排沙闸大型预应力闸墩结构模型试验的模型比尺与材料选择、混凝土配合比、模型制作、结构受力性能测试构件的布置和测试系统、加载系统以及试验流程等研究过程。对试验数据进行归纳、整理和分析,得到在各种预定工况下的预应力预压效果和闸墩颈部、闸墩与锚块接触处及锚块等控制部位的受力状态,研究在超载情况下闸墩结构的承载能力,提出进一步改进结构设计的建议。This article describes in detail the structural model test of a large prestressed pier used by a flood releasing and scouring sluice of a pump-storage power station,focusing on the followings: the scale and materials of the model,concrete mix,model building,arrangement of structure components being tested for bearing performance,testing system,loading system as well as test procedure.Through summarizing,sorting and analyzing the test data,the authors obtained the prestressed preloading effect and the stresses at the control points such as the pier neck and the pier-anchor block contacts under different given construction conditions.The bearing capacity of pier at overloading is analyzed and some suggestions for further improvement of pier structure design are proposed in this paper.
关 键 词:水工结构 预应力分析:模型试验 闸墩:预应力混凝土
分 类 号:TV662.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3