二滩水电站拱坝基础固结灌浆效果综合分析  

The comprehensive analysis on the effect of consolidation grouting in the foundation of Ertan Arch Dam

在线阅读下载全文

作  者:李春云 刘永刚 

机构地区:[1]二滩水电工程公司

出  处:《水力发电》1998年第7期44-46,共3页Water Power

摘  要:二滩水电站大坝基础固结灌浆由世界著名的专业商TREVI基础公司负责施工,采用国际通用的FIDIC模式管理,施工信息反馈快,监理工程师决策快,是固结灌浆顺利实施的关键。大坝基础固结灌浆的设计、施工是先进的,特别是有盖重引管灌浆的方法,成功地解决了大坝混凝土浇筑与基础固结灌浆相互干扰的问题。The consolidation grouting in the dam foundation of Ertan Hydropower Station is constructed by the TREVI foundation company and is managed on the basis of general international mode of FIDIC. Thus, the quick feedback of construction information and quick decision making of the Engineer are the key of smooth implementation of consolidation grouting. The technologies of design and construction of the consolidation grouting of dam foundation are advanced, especially the method of the weighted grouting successfully solves the problem of the inter disturbance between the concrete pouring of the dam and the consolidation grouting of the foundation.

关 键 词:固结灌浆 灌浆施工 水电站 拱坝基础 

分 类 号:TV543.5[水利工程—水利水电工程] TV642.4

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象