基于模糊综合评价的超高压输电线路状态评估方法思考  被引量:27

Status assessment of UHV transmission lines based on fuzzy overall evaluation method

在线阅读下载全文

作  者:纪航[1] 刘新平[1] 杨庆华[1] 孟夏卿[1] 

机构地区:[1]上海市电力公司超高压输变电公司,上海200063

出  处:《华东电力》2009年第7期1122-1126,共5页East China Electric Power

摘  要:状态检修是超高压输电线路检修策略的发展方向,准确对线路状态进行量化评估是状态检修的基础工作。目前超高压输电线路状态量化评估方法较少,已有的方法多为定性评价,也有文献提出了对电气设备状态信息进行评分并加权处理的方法,但评分方法比较简单且缺乏客观依据。结合上海市电力公司正在开展的超高压输电线路状态检修工作,提出了一种综合考虑输电线路状态信息,将线路状态信息与模糊综合评价相结合的超高压输电线路量化评估方法和步骤。实例分析表明了该方法的有效性和实用性。Status maintenance is the developing trend of the UHV transmission line maintenance strategy. And accurate status evaluation is the basis of maintenance. Currently most methods are from qualitative perspective instead of quantitative perspective. Some researches proposed weighted processing method to the status information of the equipment, But the approach is too simple and short of evidence. Based on the status maintenance work of Shanghai Electric Power Company, a new approach is developed, which combined fuzzy overall assessment with status information of the transmission lines. Case studies show that the method is effective and practical.

关 键 词:状态评分 输电线路 模糊综合评价 

分 类 号:TM711[电气工程—电力系统及自动化] TP18[自动化与计算机技术—控制理论与控制工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象