大亚湾核电站900MW核电机组超加速度保护存在的问题分析及对策  被引量:2

Analysis and Solutions of Existing Acceleration Protection Problems in 900 MW Unit of Daya Bay Nuclear Power Station

在线阅读下载全文

作  者:田丰[1] 罗向东[2] 

机构地区:[1]广东电网公司电力科学研究院,广州510600 [2]广东省电力调度中心,广州510600

出  处:《核动力工程》2009年第4期68-70,80,共4页Nuclear Power Engineering

摘  要:介绍了大亚湾核电站900MW机组一次因电网三相短路故障诱发汽轮机超加速度保护动作,直至手动打闸停机的事件,对相关问题进行了分析,并提出了取消高压截止阀对超加速度保护响应的改进措施。通过完善相关涉网自动保护和控制策略,改善了电网及核电机组本身的安全稳定性。In this paper, an incident in Daya Bay 900MW nuclear unit, in which the turbine-generator acceleration protection action was initiated by three-phase short circuit fault of power grid and then manually tripped by the operator, was introduced, and the related issues Were analyzed.An improvement measure to cancel the response of the high pressure steam valve to the acceleration protection have been put forward. The safety stability of the grid and nuclear generator unit has been improved by improving the related automatism and protection and their control strategy.

关 键 词:核电机组 超加速度保护 蒸汽阀快关 电网 可靠性 

分 类 号:TM623[电气工程—电力系统及自动化] TD534.6[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象