检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西南交通大学电气工程学院,四川成都610031 [2]四川建筑职业技术学院,四川德阳618000
出 处:《电力技术》2009年第4期34-38,共5页Electric Power Standarization & Construction Cost Control Information
摘 要:本文通过在5.12汶川大地震后新津变电站为给金马变电站提供备用电源而自己失去备用电源的问题入手,对现有备用电源自动投入装置的原理及充放电动作逻辑进行了详细的分析,提出一种能实现自适应双向互投的备自投方案,并对该方案的充放电条件及动作逻辑进行了具体研究,最后把该方案实例运用到新津变电站中解决了之前现有备自投不能解决的新津站无备用电源问题。After 5·12 Wenchuang earthquake XinJin substation lost its standby power because of supplying electric energy to JinMa substation, from which current reserve power source automatic connection equipment’s principle, charge and discharge’s logical action was analyzed. Then one new scheme of adaptive bidirectional auto-switch-in device of stand-by power supply was proposed, based on which charge and discharge’s logical action was been studied. At last, the scheme was applied to Xinjin substation’s operation, and the problem that current reserve power source automatic connection equipment lost its standby power was resolved.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117