长短桩复合地基在工程事故处理中的应用  

Application of long-short-pile composite foundation in engineering accident disposal

在线阅读下载全文

作  者:金建洲[1] 焦晓亚[2] 王双有 

机构地区:[1]郑州大学土木工程学院,河南郑州450001 [2]郑州大学综合设计研究院,河南郑州450002 [3]河南建达工程建设监理公司,河南郑州450002

出  处:《河南城建学院学报》2009年第3期13-15,共3页Journal of Henan University of Urban Construction

摘  要:长短桩复合地基是一种新型的地基处理形式。本文依据具体的工程实例,根据工程基桩承载力差异较大,且单桩承载力严重不足问题,经多种处理技术方案比较,提出在原工程桩间补入C20素混凝土短桩,组成长短桩复合地基方案。经计算满足设计要求,补桩施工完成,经检验,复合地基承载力结果达到设计要求。The long- short- pile composite foundation is a new type of foundation treatment. Since there exited some problems such as the distinct difference of the vertical bearing capacity among foundation piles and the serious lack of the vertical bearing capacity of a single pile for a given project, a scheme of long- short- pile composite foundation that the short C20 pure concrete piles are intercalated among the primary engineering pile based on the comparative study was introduced. The bearing capacity of composite foundation after treatment is sufficient for the design requirement by the theoretical computation.

关 键 词:地基基础工程 长短桩复合地基 承载力 处理方案 

分 类 号:TU473.1[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象