广东科学中心巨型钢结构基础隔震施工技术  被引量:5

Construction Technology of Base Isolation with Huge Steel Structure in Guangdong Science Center

在线阅读下载全文

作  者:许勇[1] 张季超[1] 陈原[1] 

机构地区:[1]广州大学土木工程学院,广东广州510006

出  处:《施工技术》2009年第8期100-102,共3页Construction Technology

基  金:国家科技支撑计划项目(2006BAJ27B04);科技部重大基础研究前期研究专项项目(2004CCA03300);广东省科技攻关项目(2005A11601014);建设部科技项目(05-K1-31)

摘  要:结合广东科学中心施工实践,探讨巨型钢结构联合采用大直径双橡胶隔震支座和单橡胶隔震支座进行基础隔震的施工技术,解决巨型钢结构隔震支座预埋件施工、隔震层与格构式巨型钢柱柱脚连接施工、巨型钢结构施工、隔震层构造施工等方面的技术难点,获得了良好的施工效果。重点阐述隔震支座下预埋钢板定位及固定、锚栓和螺栓套筒施工定位、螺栓孔开设、隔震缝施工等技术措施,确保隔震层的安全可靠。Based on Guangdong Science Center engineering, the application of base isolation construction technology on huge steel structure is discussed which uses lager diameter rubber double-isolators and single-isolators. The key points of construction technology and measures including isolators embedded parts, joints of isolation layer and huge steel column foots, huge steel structure and isolation layer structural measures are presented and the effects are excellent. The authors introduce location and fixture of embedded plate under isolator, construction location of anchor bolt and belt sleeve, setting of bolt hole and isolation joint construction in detail which can assure the safety and reliability of isolation layer.

关 键 词:钢结构 基础隔震 隔震支座 施工技术 

分 类 号:TU755[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象