检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:江凌[1] 邹军贤[1] 陆晶[2] 付文军[2] 刘永悦[2]
机构地区:[1]河海大学水利水电学院,江苏南京210098 [2]武汉大学水资源与水电工程科学国家重点实验室,湖北武汉430072
出 处:《水电能源科学》2009年第4期91-93,87,共4页Water Resources and Power
摘 要:为解决缅甸DAPEIN(Ⅰ)水电站泥沙通过排沙管道或泄流口不致于淤塞库区且避免泥沙流入电厂的问题,分析了取水防沙原设计方案试验中存在的问题,指出冲砂底孔进口上延方案为最优取水防沙方案,探讨了该优化方案在不同工况下的取水防沙效果,提出了运行时应注意的事项。For solving the problem of DAPEIN ( Ⅰ )Hydroelectric Station in Burma, which defenses sediment through sediment dejection pipeline or outlet silting up reservoir area and avoids it inflowing into the hydroelectric station, in the paper, it analyzes the issue existed in the original scheme experiment of water-inlet and sediment control, points out that the optimal method is sand flushing bottom-hole extending to the upstream way, discusses the effect of the optimal method in different condition, puts forward events should be paid attention to.
分 类 号:TV145[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117