检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广西电力工业勘察设计研究院,广西南宁530023
出 处:《红水河》2009年第4期15-19,共5页Hongshui River
摘 要:利用桥巩水电站泄水闸河床地形特征,布置高低两种戽式消力池。由于深河槽低戽底板厚度较大,为在底板设窄缝提供了有利条件,故在深河槽低戽的戽底设窄缝进行混合消能。经水工模型试验验证,水流消能效果良好;其体型结构简单新颖,并具有自行清理消力戽推移质的功能,也为收缩式消能原理应用在低坝上作出了新的探索。High and low bucket basins are arranged by taking advantage of topographic conditions underlining river bed at release sluice of Qiaogong Hydropower Station. A mixed way of energy dissipation is adopted as the thick bottom plate of the low bucket at deep river channel is favorable to provide narrow slot on it. Hydraulic model test is done to achieve sound effect of flow dissipation. Such design characterized by simple and novel structure is able to self remove bed load of bucket basin, which is a new attempt to do contraction energy dissipation at low dam.
分 类 号:TV222[水利工程—水工结构工程] TV653
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.235.50