戈兰滩水电站水库水温数值分析  被引量:1

Numerical Analysis on Reservoir Water Temperature of Gelantan Hydropower Station

在线阅读下载全文

作  者:马妹英[1] 王立成[1] 郭小轩[1] 赵小娜[1] 

机构地区:[1]中水北方勘测设计研究有限责任公司,天津300222

出  处:《红水河》2009年第4期61-64,共4页Hongshui River

摘  要:戈兰滩水电站建成后,正常蓄水时坝前水深超过百米,水库水温分布成为大坝设计、施工、运行管理及水环境保护工作的重要基础资料。为获取水库水温分布状况,满足工程需要,文章作者采用数值计算方法,重点分析和预测水库垂向水温分布,这种水温分布预测结果较好地反映了戈兰滩水电站水库的实际情况。After Gelantan Hydropower Station is constructed, water depth before the dam under normal im- poundment is more than 100m. The distribution of reservoir water temperature becomes important for dam design, construction and operation management as well as water environment protection. In order to learn about the distribution of reservoir water temperature, numerical calculation method is used to analyze and predict vertical water temperature distribution of the reservoir. Such prediction better indicates practical conditions of the reservoir.

关 键 词:水库 一维模型 水温结构 戈兰滩水电站 

分 类 号:TV697.21[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象