检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]内蒙古电力勘测设计院,内蒙古呼和浩特010020
出 处:《可再生能源》2009年第4期97-99,共3页Renewable Energy Resources
摘 要:近年来,我国风电产业高速发展,国内风电装机容量连续3年翻番,但风电项目实际上网电量和设计发电量还存在一些差异。文章探讨了风电场的设计后评估,主要从设计角度考察设计指标与实际运行参数的差距,并找出产生差距的具体原因。通过后评估活动进一步优化风电场设计和更加准确地计算风电投资成本和上网电价。Wind power industry in China has been increased rapidly, and the total capacity dou- bled consecutively in the past years. But, there still exist problems on the on-grid electricity and the design electricity of wind farms. Post evaluation of wind farm design in this paper is the main topic, in the view of design, compare the differences between the design targets and actually operation parameters, and find out the detailed reasons, for the sake of optimizing wind farm design and more accurately calculating for the investment costs of wind energy and the on-grid electricity price.
分 类 号:TK89[动力工程及工程热物理—流体机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145