检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海大学理学院,上海200444
出 处:《上海大学学报(自然科学版)》2009年第4期380-387,共8页Journal of Shanghai University:Natural Science Edition
基 金:国家自然科学基金资助项目(60874039);上海大学创新基金资助项目
摘 要:讨论一类二阶段流水作业问题,其中第一阶段由m台同型机组成,第二阶段为1台批处理机,目标函数是最小化各工件完工时间之和.工件在同型机和批处理机上分别有相同加工时间的情况下,给出了计算量为O(n3)的最优算法.相应工件在同型机上有相同加工时间,但在批处理机上具有任意加工时间的情况下,指出其强NP-hard后给出了近似算法,并作了性能比分析.This paper considers a two-stage flowshop scheduling problems with m identical parallel machines at stage one and a batch processor at stage two, and minimizes the total completion time. We get optimal solution in time of the order O( n^3) when all jobs have the same processing time at stage one and stage two respectively. In the case that all jobs have same processing time at stage one but have arbitrary processing time at stage two, we analyze the worst-case of an, approximation algorithm and show that the problem is strongly NP-hard in this case.
分 类 号:O223[理学—运筹学与控制论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3