检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:翟配松[1]
机构地区:[1]广西水利电力勘测设计研究院,广西南宁530023
出 处:《广西水利水电》2009年第4期23-26,共4页Guangxi Water Resources & Hydropower Engineering
摘 要:百色水电站进水口布置在含炭质泥岩、硅质泥岩以及硅质岩上,地质条件复杂。为此,分别采用圆弧法和折线法对边坡进行稳定复核计算,并根据计算的输入边界条件以及安全监测成果对计算成果进行分析论证,结果表明:进水口左侧边坡是稳定的。The water intake of the hydropower plant of Baise Multipirpose Dam Project is located on carbonaceous rnudstone, siliceous mudsione and silicalite with complicated geological conditons. Arc method and dogleg method were adopted respectively to calculate the stability of bank slope. The calculating results were analyzed and discussed combined with the input boundary conditions and the safety monitoring data. It is concluded that the left bank slope at watet intake is stable.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.42