苏通大桥南引桥箱梁现浇支架整体平移施工  被引量:7

Integral Translation of Scaffolding for Cast-in-Situ Concreting of Box Girders of South Approach Spans of Sutong Bridge

在线阅读下载全文

作  者:李昊天[1] 杨敏[1] 米长江[1] 欧阳祖亮[1] 

机构地区:[1]中交第二公路工程局有限公司,陕西西安710065

出  处:《桥梁建设》2009年第A01期4-7,共4页Bridge Construction

摘  要:苏通大桥南引桥尾跨箱梁采用支架现浇施工,施工支架为贝雷梁钢管桩式支架,右幅箱梁施工完成后,采用整体平移的方式将施工支架整体平移至左幅进行箱梁施工。对支架整体平移的抗倾覆稳定性、支架受力、载重滚轮小车承载能力、钢管桩接头强度和平移牵引力进行分析计算,介绍牛腿及轨道梁、载重滚轮小车、牵引支架的安装工艺以及牵引支架、牵引行进控制和钢管桩连接等关键技术的实施。The concrete for the end span box girders of the south approach spans of Sutong Bridge was cast in situ on the scaffolding that was formed by the Bailey truss and steel pipe piles. After the construction of the right half of the girder was completed, the scaffolding was then translated in a integrity way to the side of the left half of the girder to continue the concrete casting there. The overturning stability, force conditions, roller trolley carrying capacity, pipe pile joint strength and hauling force for the translation of the scaffolding are analyzed and calculated, the construction technology for the installation of the brackets, rail beams, roller trolleys and hauling frames are introduced and the implementation of the key techniques for the hauling frames, hauling force control and pipe pile jointing is described as well.

关 键 词:苏通大桥 箱形梁 支架 整体平移 施工方法 施工工艺 

分 类 号:U445.35[建筑科学—桥梁与隧道工程] U445.4[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象