作 者:欧阳效勇[1] 张建军[1] 高安荣[1] 王佳[1] 许鹏[1]
机构地区:[1]中交第二公路工程局有限公司,陕西西安710065
出 处:《桥梁建设》2009年第A01期32-35,共4页Bridge Construction
摘 要:鄂东长江大桥主桥为混合梁斜拉桥,钢箱梁桥面吊机安装前须预先吊装塔梁段非标准钢箱梁段(M、F梁段)。由于梁段重200 t以上,加之下游桥梁通航高度较低,选用镇航工818号1200 t浮吊;M、F梁段位于桥塔江侧水域,吊装占用部分航道,浮吊抛锚、起锚、吊装施工组织及施工水域的维护要求较高。通过选择合理的吊装施工工艺,成功完成了M、F梁段的吊装,定位平面轴线偏差远小于施工要求。The main bridge of Edong Changjiang River Bridge is a hybrid girder cable-stayed bridge. Before the deck crane is installed on the steel box girder of the bridge, the non-standard steel box girder, sections (sections M and F) at the pylon and girder section must be installed first. Because the weight of a girder section is heavier than 200 t and the vertical navigation clearance under the downstream bridge is low, the 1 200-t capacity Zhenhanggong 818 Floating Crane is selected for the lifting and installation of the girder sections. The sections M and F are on the river side close to the pylon and the lifting and installation operation will occupy part of the navigation channel, for this reason, the anchor casting and lifting, the construction organization for the lifting and installation and the protection for the construction water area are all very demanding. With the utilization of the rational construction technology, the lifting and installation of the sections M and F are finally successfully completed and the plane axis tolerances of positioning of the sections are less than those required by the construction.
分 类 号:U448.27[建筑科学—桥梁与隧道工程] U445[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249