检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁隧道集团科研所,河南洛阳471009 [2]中铁隧道集团西格二线指挥部,西宁810000
出 处:《隧道建设》2009年第4期411-414,共4页Tunnel Construction
基 金:铁道部科技研究开发计划项目(2007G035)
摘 要:关角隧道是世界高海拔第一长隧,共设10座辅助斜井,无轨运输系统组织施工,斜井工区施工通风难度大。介绍施工通风斜井分隔方案的设备布置、能耗分析、中隔板结构形式、防漏风措施等技术,通过斜井分隔方案在关角隧道10号斜井的现场应用和通风效果测试,表明斜井分隔方案可以在无轨运输斜井的施工通风中推广应用。Guanjiao tunnel is the longest high altitude tunnel in the world. 10 assistant inclined shafts are set for the tunnel and trackless transportation system is used in each inclined shaft. The ventilation of the inclined shaft work lots during tunnel construction is difficult. This paper aims to introduce the equipment layout, energy consumption analysis, false ceiling structure and air leakage prevention measures of inclined shaft partition method used for ventilation during the tunnel construction. The ventilation effect of the inclined shaft partition method used in the lOth inclined shaft work lot of Guanjiao tunnel demonstrates that the inclined shaft partition method can be promoted in the ventilation of inclined shafts with trackless transportation systems.
分 类 号:U453.5[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.140.246.156