斜层平推法在居甫渡电站碾压混凝土坝中的运用  被引量:2

The Use of the Inclined Layer Horizontal Pushing Method of Concrete Placement for Construction of the Roller Compacted Concrete Dam of Jufudu Hydropower Project

在线阅读下载全文

作  者:李志斌 邓清树 李文斌 

机构地区:[1]中国葛洲坝集团第五工程有限公司,湖北宜昌市443000 [2]云南大唐国际李仙江流域水电开发有限公司,云南昆明650011

出  处:《云南水力发电》2009年第4期72-75,共4页Yunnan Water Power

摘  要:居甫渡水电站为了确保在低强度施工条件下的碾压混凝土施工质量,根据自身特点和借鉴了相关工程的成功经验,采用斜层平推铺筑法碾压混凝土施工新技术,取得了较好的施工效果。In order to ensure the miler compacted concrete dam construction quality of Jufudu Hydropower Project under the condition of construction with low intensity the inclined layer horizontal pushing method of concrete placement was used for construction of the miler compacted concrete dam of Fufudu Hydropower Project according to both the characteristics of its own and the successful experience obtained from other completed dams of this kind. It is a new technology and has proved successful.

关 键 词:斜层平推铺筑 施工工艺 碾压参数 质量检测 

分 类 号:TV544.921[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象