常规游梁式抽油机改造成异相型抽油机的实践  被引量:5

Reforming conventional pumping unit into phased pumping unit

在线阅读下载全文

作  者:白瑜明[1] 周彩霞[1] 刘治和 李宏伟[1] 

机构地区:[1]中原石油勘探局采油六厂,山东省东明县274511

出  处:《石油机械》1998年第6期32-33,共2页China Petroleum Machinery

摘  要:在对比分析常规游梁式抽油机与异相型抽油机结构参数的基础上,提出将CYJ12-4.2-73HB型常规游梁式抽油机改造成异相型抽油机的具体方案:将常规机的曲柄、曲柄销和连杆,用12型异相抽油机的曲柄、曲柄销和连杆替代,并将横梁与游梁连接的轴承座前移。这样改造既解决了在用常规机配件供应匮乏的问题,又可节约可观的设备购置资金。现场使用情况表明,改造成的异相型机运行平稳可靠,冲程增加7%,相应提高了油井产液量和采油时率,并具有一定的节能效果。Afer a contrast and analysis of structural parameters of conventional pumping units and phased pumping units, a concrete scheme for reforming Model CYJ12 - 4 .2 - 73HB conventional beam pumping unit into phased pumping unit is proposed, i.e. replacing the crank, crank pin and pitman of the conventional pumping unit with that of the phased pumping unit, and moving forward the bearing seat for the walking beam and cross beam connection. Field operation shows that, the reformed pumping unit runs smoothly with a 7% increase of stroke, and production rate and efficiency are improved with a reduction of power consumption.

关 键 词:游梁式抽油机 异相游梁抽油机 改造 抽油机 油田 

分 类 号:TE933.103[石油与天然气工程—石油机械设备]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象