作 者:易俊[1] 孙华东[1] 郭强[1] 卜广全[1] 赵良[1]
机构地区:[1]中国电力科学研究院,北京市海淀区100192
出 处:《电网技术》2009年第16期14-19,共6页Power System Technology
基 金:国家电网公司科技项目(SGKJ[2007]996)
摘 要:简述国内外特高压输电系统的发展运行情况,分析大型电源基地直接接入特高压输电系统的合理性和可行性,对大型电源基地直接接入特高压输电系统和经过二次升压接入特高压输电系统的经济性进行比较。结果表明,大型电源基地采用何种方式接入特高压输电系统需要根据实际情况确定,在不同的情况下采用不同的接入方式。The development and operation situation of ultra high voltage (UHV) transmission systems home and abroad are described in brief, the reasonability and feasibility of directly connecting bulk power base to power grid by UHV transmission system are analyzed, and the economy of the two connecting modes, i.e., directly connecting bulk power base with UHV transmission system and connecting bulk power base to power grid via twice step-up, are compared. Comparison conclusion shows that how to connect bulk power base with UHV power transmission system should be determined according to actual conditions, different grid-connecting modes should be adopted under different conditions.
分 类 号:TM72[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30