检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西南科技大学土木工程学院,绵阳621002 [2]西南交通大学地下工程系,成都610031
出 处:《岩土力学》2009年第9期2815-2822,共8页Rock and Soil Mechanics
基 金:西部交通建设科技项目(No.2003-318-780-12)
摘 要:通过大量二维、三维数值模拟计算,分析了围岩、净距、埋深等条件对小净距隧道爆破振动特性的影响,研究了先行隧道不同支护体系、不同中岩墙加固措施及后行隧道不同施工方案等情况下,小净距隧道中后行隧道爆破开挖对先行隧道的影响。根据研究结果,提出了中岩墙加固宜采用注浆加固、先行隧道初期支护宜及时跟进并封闭、掏槽眼宜远离中岩墙以及开挖进尺不宜大于净距的1/3等小净距隧道爆破施工的控爆措施,以供小净距隧道爆破开挖设计、施工借鉴。Effects of surrounding rock, clear-distance and buried depth on blasting vibration characteristics of small clear-distance tunnel are analyzed by two and three-dimensional numerical simulations; and effects of blasting in lately excavated tunnel on early excavated tunnel are studied for different support systems, reinforcement measures of middle wall of early excavated tunnel and different construction plans of lately excavated tunnel. According to research results, such blasting control measures of tunnel construction are provided that middle wall should be reinforced by grouting, and primary support of early excavated tunnel should be closed down in time; and hole cut should be far away from middle wall and advance should not greater than one-third of clear-distance. All measures can be for reference in design and construction for blasting excavation of small clear-distance tunnels.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249