包钢3#高炉中修开炉快速达产实践  被引量:1

Practice on Arrival at No.3 Blast Furnace Full Capacity with Medium Maintenance and Blow-in of Baotou Steel

在线阅读下载全文

作  者:贾西明[1] 郝志忠[1] 王利廷[1] 

机构地区:[1]内蒙古包钢钢联股份有限公司炼铁厂,内蒙古包头014010

出  处:《包钢科技》2009年第4期37-40,共4页Science & Technology of Baotou Steel

摘  要:文章对包钢3#高炉(2 200 m3)开炉及达产的生产操作经验进行了总结。在开炉生产中,采用全焦开炉,科学配料计算,优化装料方案、制定合理的操作制度,加强炉内操作和炉前出铁,实现开炉3天快速达产。This article summarizes blow- in and the operating experiences of arrival at No. 3 blast furnace(2 200 m3) full capacity of Baotou Steel Corporation. With adopting coke only, calculating the burden scientifically, optimizing the charging plans, and establishing reasonable operating regulations in the process of blow - in, as well as reinforcing the furnace operations and tapping,the full capacity was rapidly arrived in 3 days of blow -in.

关 键 词:高炉 开炉 装料 达产 

分 类 号:TF542[冶金工程—钢铁冶金]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象