检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《华北水利水电学院学报》2009年第3期25-28,共4页North China Institute of Water Conservancy and Hydroelectric Power
摘 要:通过建立大隆水利枢纽溢洪道水工物理模型,对溢洪道运行的水力特性和体形结构进行试验研究,优化了进水渠左导墙布置、控制段中墩形式和挑流鼻坎尺寸,使泄洪流态更平顺,水库调度运行更合理,满足消能防冲要求,减少溢洪道工程的工程量和造价.A hydraulic physical model of the spillway in Dalong key water control project is constructed, and the structure and hydraulic characteristics of the spillway are studied using hydraulic model test. The set of the left guide wall of inlet channel, the form of the piers and the size of the deflection bucket are optimally designed to make outlet flow smoother and the reservoir operation more reasonable. So, the spillway can be protected against erosion and the cost of spillway building can be cut down.
分 类 号:TV651.1[水利工程—水利水电工程] TV131.61
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15