小湾水电站高拱坝设计与基础处理  被引量:5

Design and Foundation Treatment of High Arch Dam of Xiaowan Hydropower Project

在线阅读下载全文

作  者:邹丽春[1] 喻建清[1] 王国进[1] 

机构地区:[1]中国水电顾问集团昆明勘测设计研究院,云南昆明650051

出  处:《水力发电》2009年第9期35-37,共3页Water Power

摘  要:小湾拱坝高达294.5m,总水推力为176520kN。拱坝应力水平高,最大主压应力按10MPa控制。工程位于强地震区,拱坝抗震设防要求高。通过可行性研究、初步设计以及国家"九五"科技攻关等一系列研究,逐步解决了小湾拱坝体形优化、坝踵防裂防渗、抗震、泄洪消能、坝基基础处理和坝肩抗力体地质缺陷处理等关键技术。The maximum height of Xiaowan arch dam is 294.5m, and the total hydraulic thrust load undertaken by the dam is amount to 176 520kN. The dam stress level is high, and the maximum design compressive stress is controlled to be less than 10MPa. The dam is located in strong earthquake zone, so its seismic fortification design must meet related requirements. After many studies and researches, some key technologies, such as the shape optimization of arch dam, crack and seepage control at dam heel, the seismic fortification measures, the flood discharging and energy dissipation measures, dam foundation treatment and the abutment foundation treatment, have been solved progressively.

关 键 词:拱坝 体形 坝踵防裂防渗 抗震措施 泄洪消能 基础处理 小湾水电站 

分 类 号:TV642.42[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象