检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]武汉大学水利水电学院,湖北武汉430072 [2]四川大学建环学院,四川成都610065 [3]四川大学水电学院,四川成都610065
出 处:《水力发电》2009年第8期34-36,44,共4页Water Power
基 金:国家自然科学基金重大研究计划资助项目(90715026)
摘 要:基于热传导理论,结合百色水利工程RCC坝温度控制及施工措施,对该坝的典型坝段温度场及温度应力影响模型进行三维数值仿真分析。坝上游与水面考虑为热传递,而坝体临空面考虑为与空气热交换,分别对坝体边界部位及坝体内部进行仿真分析,并将结果与坝体预埋光纤温度监测结果进行了对比研究。结果表明,竣工后较长时期内,坝体温度场仍呈动态变化特性,计算温度值因对边界条件模拟的简化而产生了一定误差,而计算温度值与光纤实际观测温度值亦存在一定偏差。Based on heat transfer theory and temperature control method of RCC dam of Baise Project tridimensional numerical simulation of impottant monolith of Baise dam were completed on temperature field and stress model. Heat transport process was appeared between water and upstream dam. Downstream dam was considered as heat exchange with air. Dam's boundary and centre position were implemented individually simulative analysis. Temperature results from numerical computation was compared with data from fiber monitoring. It showed that temperature field of dam is on dynamic state in long period and computational temperature data is with some errors from the simplified simulation of boundary conditions. Deflections were occurred between computation data and fiber monitoring value.
关 键 词:水工大体积混凝土 温度场 数值模拟 光纤温度监测
分 类 号:TV544.91[水利工程—水利水电工程] TV698.11
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.58.173.156