作 者:赵常伟[1]
机构地区:[1]山东泰山抽水蓄能电站有限责任公司,山东泰安271000
出 处:《水力发电》2009年第8期67-68,71,共3页Water Power
摘 要:针对抽水蓄能电站首台机组首次起动,是选择水轮机工况起动还是水泵工况起动,对两种工况的前提条件、试验顺序以及调试、继电保护方向校核、SFC拖动机组的机械安全问题等进行了技术经济性分析,最终认为水泵工况起动是抽水蓄能电站首台机组首次起动的首选方式。There has been controversial about first start-up of the first generating unit of pumped storage power plant whether it would adopt the starting-up mode by the working condition of turbine or pump. This paper conducts technical and economic analysis on the problems such as two working conditions' prerequisite, test order, commissioning, relay protection check and the mechanical safety of SFC driving generating unit. Finally it concluded that the start-up by the working condition of pump is a preferred mode for the first start-up of the first unit of pumped storage power plant.
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.175