检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]湖南科技学院,湖南永州425100 [2]重庆大学建设管理与房地产学院,重庆400045
出 处:《建筑经济》2009年第10期64-67,共4页Construction Economy
摘 要:在对工程项目评标影响因素进行分析的基础上,建立综合评价指标体系,提出了依据模糊隶属度把定性评价转化为定量评价的模糊综合评价模型,使评标方法在综合性、合理性、科学性等方面得到了改进。结合案例进行实证的分析表明将模糊综合评价方法用于工程招投标具有实用性和有效性。Based on studying influence factors involved in appraising bid of engineering project, a comprehensive e- valuation index system is established firstly.According to fuzzy membership grade method that can transfer the qual- itative evaluation to the quantitative one, a fuzzy comprehensive evaluation model is proposed, which, to a great de- gree, promotes the development of bid evaluation method with more comprehensive, reasonable and scientific. In the end, a case study is carried out, indicating that application of fuzzy comprehensive evaluation in appraising bid of engineering project is practicable and effective.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28