检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谢盛青[1] 王新民[1] 史良贵 赵彬[1] 张钦礼[1]
出 处:《金属矿山》2009年第9期44-47,共4页Metal Mine
基 金:国家科技支撑计划课题(编号:2006BAB02A03);2008年度中南大学米塔尔创新资助项目(编号:08MX16)
摘 要:焦家金矿北部矿山矿岩破碎、充填体稳定性不理想,本研究对该矿不同进路的采场结构和人工假顶承载层厚度条件下承载层及相邻充填体的应力、应变、塑性变形等情况进行了数值模拟、非线性分析。根据分析结果,12种模型的承载层压应力过大,极有可能发生破坏;相邻充填体几乎均发生压坏现象,进路回采安全性差。故建议优化人工假顶构筑工艺,增加承载层强度,提高进路回采安全性。There are lots of crushed ore rocks and unstable filling body in north of Jiaojia gold mine. The numerical simulation and analysis on different ways of stope structure and artificial false top bearing layer thickness and bearing layer were done under the condition of adjacent filling the stress, strain and plastic deformation status, etc. According to this analysis, over stress for 12 kinds of model bearing bed possibly causes damage;Meanwhile, almost all adjacent filling bodies have been damaged with poor mining security. Therefore, the building process of artificial roof should be optimized; the bearing layer should be strengthened; and the security in mining should be also improved.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28