作 者:梁周[1] 傅渝洁[1] 杨鹏举[1] 张怡[1] 曾鸣[1] 田廓[1]
机构地区:[1]华北电力大学能源与电力经济研究咨询中心,北京102206
出 处:《华东电力》2009年第9期1565-1568,共4页East China Electric Power
基 金:国家自然科学基金资助项目(70671041)
摘 要:结合我国的电力规划以及发电、输电资源的现状,提出了考虑跨区省输电的综合资源规划,首先描述了需求侧资源、供应侧资源以及跨区省输电资源的概况,其次以综合能源成本为准则,对省区内外的各种资源进行筛选,得出总成本最小的电力资源组合,最后以我国某省的实际数据验证了该模型的实用性。Based on the current situation of electric power planning and generation and transmission resources in China, a new integrated resource planning (IRP) method, which takes the inter-regional transmission into account, was proposed. The jprofile of the demand side resource, the supply side resource, and the inter-regional transmission resource was presented, and the principle of integrated cost of energy (ICOE) was adopted for selection of a variety of demand side and supply side resources. Based on that, the combination of power resources with minimum total cost could be obtained. A calculation example proved the model effective.
分 类 号:TM715[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145