检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]胜利工程设计咨询有限责任公司,山东东营257000
出 处:《海岸工程》2009年第3期69-75,共7页Coastal Engineering
摘 要:介绍和分析了飞雁滩油田保滩促淤先导试验工程中采用的倒"T"形潜堤结构、初期破坏原因及相应加固措施,初步探讨了潜堤的保滩促淤效果和淤积速率,并对潜堤顶高程设计提出了建议。A submerged dike with a cross section looking like an inverted "T-shape"is in- troduced and analyzed,which is used in the preliminary experinment for the shore pro- tection with depositional intensification in Feiyantan Oil field. The cause for the damage occurred in the early time after the dike had been built and the succeeded reinforcement measures are also analyzed. Then the dike effects on the shore protection and the deposi- tional intensification,and the depositional rates are discussed. Finally a suggested rela- tive elevation to the top surface of the dike is proposed.
分 类 号:TV865[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117